
Equipment Preparation
Use the selected cup range, configuration and factory requirements to make the machine discussion specific.
Workshop notes connect the machine, the people responsible for each step and the evidence a buyer needs. New stories will be added only when the date, process and images can be verified.

These are current process references, not customer-result claims.

Use the selected cup range, configuration and factory requirements to make the machine discussion specific.

Connect operating controls, agreed trial points and troubleshooting evidence to the confirmed machine scope.

Prepare packing scope, shipping marks, loading references and unloading inputs before dispatch.
A verified date or project stage and the relevant work area.
The machine, cup, component or delivery task without inventing customer details.
A practical engineering, inspection, FAT or delivery takeaway.
Original images, measurements, documents or process records with permission.
Use the Project Proof structure to agree what should be reviewed before shipment.