From cup specification to a production-ready setupWhatsApp: +86 135 2656 7976
Project Proof

Evidence Before Claims

Project Proof is the HANNAI structure for defining what the buyer can review from cup requirement and configuration through FAT, packing and production preparation. The exact record set follows the confirmed order.

Paper cup machine and collection system used for project evidence planning
Project Record Structure

One Evidence Chain From Requirement to Startup

This is a standard record format, not a claim that every project uses the same machine, test material or service scope.

  1. 01Country / Region

    Destination and applicable factory conditions.

  2. 02Cup & Material

    Dimensions, application, paper and coating.

  3. 03Target Output

    Required speed, daily volume and workflow.

  4. 04Configuration

    Machine, mold, utilities and supporting scope.

  5. 05FAT Points

    Agreed trial conditions and inspection items.

  6. 06Packing & Delivery

    Marks, packed scope and loading references.

  7. 07Production Support

    Startup inputs and confirmed support terms.

Evidence Types

What a Project File Can Contain

The examples below use real HANNAI machine and workshop references. They explain the record type and do not identify an unapproved customer project.

Paper cup machine system for cup and configuration confirmation
01Cup & Configuration Record

Cup dimensions, material, mold and confirmed machine basis.

STATUS: project-specific when agreed
Paper cup machine in a workshop trial environment
02FAT Record

Trial material, running condition, checkpoints and requested photo or video scope.

STATUS: project-specific when agreed
Paper cup forming station for quality inspection planning
03Inspection Record

Machine condition, forming points and finished-cup checks within the agreed scope.

STATUS: project-specific when agreed
Packing and loading preparation in the machinery workshop
04Delivery Record

Packing list, marks, packed dimensions and agreed loading references.

STATUS: project-specific when agreed
Document System

Use the Same Language Across the Project

Model DatasheetConfiguration SheetFAT PlanInspection ChecklistPacking RecordSupport Scope

Only confirmed model specifications and project-specific records should be treated as final deliverables.

Publication Standard

Real Projects, With Permission

Future case records will be published only after the project facts, media and customer permission are verified. Anonymous cases can omit the buyer's name while retaining useful technical context.

WhatsApp